Before renovation — placeholder, to be replaced with real photo
After renovation — placeholder, to be replaced with real photo

Before
After

Visual note: the comparison images above are illustrative references, not verified before-and-after photographs from this project. They are labelled this way until project photography is available.
Location
Sector 7, Rohini, Delhi
Layout
Approx. 6.5 ft straight kitchen
Timeline
19 days
Recorded budget
₹2.4 lakh

A Small Kitchen Where Workflow Was the Real Problem

This Sector 7, Rohini kitchen had not been renovated for almost six years. The footprint was compact — roughly 6.5 feet on a single wall — so the answer was not to force in more cabinetry. The opportunity was to make the existing run work harder.

The homeowners’ daily routine made that especially important. With most cooking happening during a short morning window, the sink, stove, fridge movement and everyday storage all needed to work without creating unnecessary steps or clutter.

What We Changed

01 · Reworked the cooking zone
The stove was shifted 18 inches to create better elbow room around the sink and improve the working relationship between the main preparation points.
02 · Replaced dead storage
A tall pull-out was introduced where the old sagging shelf had been, giving dedicated space for tiffin boxes and spice jars.
03 · Kept the room visually light
Warm oak laminate was used on the base cabinets while the overheads stayed white acrylic, helping the compact kitchen feel brighter.

Materials & Finish

The recorded specification uses BWP-grade waterproof ply for the cabinetry, warm oak laminate on the base units and white acrylic on the overhead cabinets. The combination was chosen around everyday practicality and the limited natural light reaching this side of the flat.

The Site Issue That Changed the Timeline

During installation, the existing chimney electrical point was found on the wrong wall. Rerouting it added four days to the programme. The project record notes that this measurement-related issue was absorbed by the team rather than passed on to the homeowners.

The final measurement-to-handover timeline was 19 days, including the electrical rework.

Project Cost & Scope

Cost / scope item Recorded project detail
Cabinet core BWP-grade waterproof ply
Base cabinet finish Warm oak laminate
Overhead finish White acrylic
Storage upgrade Tall pull-out for tiffin boxes and spices
Electrical rework Chimney point rerouted; 4 extra days
Final recorded project budget ₹2.4 lakh


The project record contains a total budget but does not provide an item-by-item rupee breakup. We have intentionally not invented a component-wise cost split.

The Result

The biggest change was not visual. The mixer could be stored inside a pull-out instead of occupying the counter, the stove gained more usable elbow room, and the fridge movement no longer fought the working area. For a compact straight kitchen, storage planning and circulation mattered as much as the finish.

Planning a Similar Kitchen in Rohini?

Start with the actual room dimensions, existing plumbing and electrical points, appliance positions and the storage you use every day. See our
modular kitchen design service
or
Delhi NCR modular kitchen cost guide